水泵说明书英文翻译
Divide the demolition and re-installation

⑴. Trip will be set up to regulate 100% and disconnect the power motor. ⑵. The release of all the pressure pipeline system.
⑶. When invited to take the demolition warnings in the list of all preventive measures. ⑷. Import and export of cut-off valve closed.
⑸. Pump in the head at a location at the bottom of the pot containing Lou Ye. ⑹. The pipeline from the pump head off location, in accordance with the safety of all pumping from the media.
⑺. Demolition of all screws, leaving only pump in the head position at the top of a screwdriver. When the screw when the media release from the head position of the pump leaked out.
⑻. Tilt the head position will pump check valve in the residual liquid into a suitable container, in compliance with safety instructions.
⑼. Demolition of the remaining one screw, use the appropriate medium wash or clean the pump head position and divide. ⑽. Counterclockwise rotation removed the divide.
⑾. Check whether the divide and enhance the board from cracks or damage. If damage should be replaced.
⑿. Installation divide. Clockwise will be installed to divide axis.
⒀. Installation of pumps in the head position should be the turn of the screw fastening to ensure that the force uniform.

水泵说明书英文翻译Divide the demolition and re-installation ⑴. Trip will be set up to regulate 100% and disconnect the power motor. ⑵. The release of all the pressure pipeline system. ⑶. When invited to take the demolition warnings
拆卸和重新安装分
⑴.旅行将建立规范100%和断开电源,电机.⑵.所有的压力管道系统的释放.
⑶.当被邀请在所有的预防措施以拆除警告列表.⑷.进口和出口关闭截止阀.
⑸.在含有娄烨罐底部位置的泵头.⑹.从泵头位置的管道,按照各抽来自媒体的安全.
⑺.所有螺丝拆除,只留下泵在螺丝刀头的位置上.当螺杆在媒体上发布从泵头位置泄漏.
⑻.倾斜头部的位置将止回阀在剩余的液体倒入适当的容器中,在与安全指南依从性.
⑼.剩下的一个螺丝,拆卸,使用适当的介质清洗或清洗泵头的位置和分.⑽.逆时针旋转将分.
⑾.检查是否将从裂缝或损坏的加强板.如果损坏应更换.
⑿.安装分.顺时针方向将安装分轴.
⒀.在头部的位置,泵的安装应的紧固螺钉,确保受力均匀的转.

把拆迁和重装
⑴。旅行将被设置为调节100%和断开功率电动机。⑵。释放所有的压力管道系统。
⑶。当邀请采取拆除警告列表中的所有预防措施。⑷。进口和出口截止阀关闭。
⑸。泵的头在一个位置在罐子底部包含娄烨。⑹。管道从泵头关闭位置,按照安全的所有泵从媒体。
⑺。所有螺丝拆除,只留下泵在头的位置在顶部的螺丝刀。当螺丝当媒体发布从头部位置的泵泄漏。
⑻。头部位置将泵...

全部展开

把拆迁和重装
⑴。旅行将被设置为调节100%和断开功率电动机。⑵。释放所有的压力管道系统。
⑶。当邀请采取拆除警告列表中的所有预防措施。⑷。进口和出口截止阀关闭。
⑸。泵的头在一个位置在罐子底部包含娄烨。⑹。管道从泵头关闭位置,按照安全的所有泵从媒体。
⑺。所有螺丝拆除,只留下泵在头的位置在顶部的螺丝刀。当螺丝当媒体发布从头部位置的泵泄漏。
⑻。头部位置将泵止回阀在残余液体在合适的容器里,在遵守安全指示。
⑼。剩下的一个螺丝拆除,使用适当的介质清洗或清洗泵头的位置和分裂。⑽。逆时针旋转把分裂。
⑾。检查是否分裂和提高董事会从裂缝或损伤。如果损坏应更换。
⑿。安装分。顺时针将安装分轴。
⒀。泵的安装在头部的位置应该交替的螺钉连接,以确保力均匀。